Post by Million Dollar Babies on Sept 22, 2020 20:20:46 GMT 1
If I was a real football man I wouldn't be spying from McDonalds car park, I'd be getting the full guided tour with Positive last word from me i wasnt getting a full conducted tour the day before the wba game walked roundwith a director friend.
|
|
|
Post by Up the Duff. on Sept 23, 2020 7:32:07 GMT 1
from "PL money will set us up for years to come, with a state of the art training ground to nurture talent being a lasting legacy" to "the moneys gone, apart from my 50m that i want back in 3 years...oh and i want to keep 25%" utter shambles. this training ground made me so hopeful for the future - we really could have attracted some of the best kids around with our new model. the tide is turning a bit and parents are starting to 'get' that going to these PL academies in not necessarily the best option...i really hope we can attract these players as we have nothing to prop us up and phil gets all the stick because he cant plaster the pissing seive of the last few years The tide is turning Ritchie and the model town are working on is slowly showing fruition.having seen first hand what a good group which enabled Ian Lawson the Clark brothers john worhington j stead etc to become first team regulars this present cropp has all the potential to be the best of the lot.as with all young players the secret is handling them right i.e. When to put them in and take them out and I'm sure these coaches will do that Attracting the best young kids is not so easy if you are in league one though. You said you had seen the facilities and that they are first class, how though have the plans been scaled back and downgraded from the initial ones that we were shown ? How much is being saved ?
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Sept 23, 2020 13:29:50 GMT 1
The tide is turning Ritchie and the model town are working on is slowly showing fruition.having seen first hand what a good group which enabled Ian Lawson the Clark brothers john worhington j stead etc to become first team regulars this present cropp has all the potential to be the best of the lot.as with all young players the secret is handling them right i.e. When to put them in and take them out and I'm sure these coaches will do that Attracting the best young kids is not so easy if you are in league one though. You said you had seen the facilities and that they are first class, how though have the plans been scaled back and downgraded from the initial ones that we were shown ? How much is being saved ? there will not be a seccond tier and as for how much is being saved im not aware of the figures so cannot answer that. but i say again the training ground his first class
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Sept 23, 2020 13:34:02 GMT 1
jimmys son came through the ranks and played in first team under brian horton good strong front man but a bad ankle injury which he never really recovered from went to stockport county but a good player.
|
|
|
Post by Galpharmer on Sept 23, 2020 14:08:18 GMT 1
jimmys son came through the ranks and played in first team under brian horton good strong front man but a bad ankle injury which he never really recovered from went to stockport county but a good player. Better golfer than footballer.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Sept 23, 2020 21:04:24 GMT 1
jimmys son came through the ranks and played in first team under brian horton good strong front man but a bad ankle injury which he never really recovered from went to stockport county but a good player. Better golfer than footballer. he is a good golfer but a good lad who got unlucky with injury
|
|
deo1
Andy Booth Terrier
[M0:0]
Posts: 3,882
|
Post by deo1 on Sept 23, 2020 21:24:05 GMT 1
Canalside is a joke and a right white elephant. He banned the public, said he was spending £20 million on upgrades needed to take us to the next level and hasn’t done, he’s believed to own the facility and rent it back to town and got rid of the snooker, bowling and gym!!!
I want to know what actual upgrades they’ve actually done and why the original plan was shelved. I’ve no time for the club at the moment and if this continues along with the pathetic performances on the pitch can’t see me buying another season ticket again after this season.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Sept 24, 2020 0:18:22 GMT 1
It’s a disgrace, Joe. The Rec Club was perfectly fine for many, ms y years until Hoyle got his hands on it, kicked out the members and now even makes the club pay rent to use it.
Still no answers if the ground shares are in trust as promised years ago either.
There are too many coincidences of money and assets being transferred into private hands for my liking.
|
|
|
Post by themanfromatlantis on Sept 24, 2020 8:52:05 GMT 1
We're a right bunch of doom laden moid hoovers on here aren't we...
Is it mandatory for a football club supporter to be a moaning bastard? 😁
'Football club supporter', there's an age old irony somewhere in that name...
|
|
|
Post by Mastercracker on Sept 24, 2020 9:16:10 GMT 1
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Sept 24, 2020 10:59:15 GMT 1
Canalside is a joke and a right white elephant. He banned the public, said he was spending £20 million on upgrades needed to take us to the next level and hasn’t done, he’s believed to own the facility and rent it back to town and got rid of the snooker, bowling and gym!!! I want to know what actual upgrades they’ve actually done and why the original plan was shelved. I’ve no time for the club at the moment and if this continues along with the pathetic performances on the pitch can’t see me buying another season ticket again after this season. good lad! bloody hell! as for canalside white elephant? bullshit end off
|
|
ben1987
Mental Health Support Group
Posts: 7,156
|
Post by ben1987 on Sept 24, 2020 16:31:12 GMT 1
Club representatives stated that the current phase of redevelopment is almost complete. In response to questions from panel members, they confirmed that the three-storey building outlined in the original plans has not been built. Mark Devlin explained that the club has planning permission for the building, which may be acted upon in the future. He also stated that the club has invested approximately £6-7 million on the redevelopment project. Some panel members were disappointed that the original plans had been scaled back, while others questioned the club’s lack of communication on the subject. In general, opinions were mixed. Mark Devlin responded by assuring those present that the training facilities are excellent. He did, however, recognise that the club’s communications have not been as clear as they could have been. David Threlfall-Sykes said that the club will release further information once the current phase of redevelopment is complete, which is expected to be a matter of weeks. Att minutes are below mate www.htsa-web.com/post/meeting-minutes-of-the-all-together-town-att-panel-23-09-20
|
|
|
Post by Mastercracker on Sept 24, 2020 16:35:01 GMT 1
Club representatives stated that the current phase of redevelopment is almost complete. In response to questions from panel members, they confirmed that the three-storey building outlined in the original plans has not been built. Mark Devlin explained that the club has planning permission for the building, which may be acted upon in the future. He also stated that the club has invested approximately £6-7 million on the redevelopment project. Some panel members were disappointed that the original plans had been scaled back, while others questioned the club’s lack of communication on the subject. In general, opinions were mixed. Mark Devlin responded by assuring those present that the training facilities are excellent. He did, however, recognise that the club’s communications have not been as clear as they could have been. David Threlfall-Sykes said that the club will release further information once the current phase of redevelopment is complete, which is expected to be a matter of weeks. Att minutes are below mate www.htsa-web.com/post/meeting-minutes-of-the-all-together-town-att-panel-23-09-20I've liked your post, but my actual feelings on the subject couldn't be any further from like. Rug absolutely pulled or what. Where's the extra £13m? Squirreled away in Upper Hopton I imagine.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Sept 24, 2020 16:41:32 GMT 1
Club representatives stated that the current phase of redevelopment is almost complete. In response to questions from panel members, they confirmed that the three-storey building outlined in the original plans has not been built. Mark Devlin explained that the club has planning permission for the building, which may be acted upon in the future. He also stated that the club has invested approximately £6-7 million on the redevelopment project. Some panel members were disappointed that the original plans had been scaled back, while others questioned the club’s lack of communication on the subject. In general, opinions were mixed. Mark Devlin responded by assuring those present that the training facilities are excellent. He did, however, recognise that the club’s communications have not been as clear as they could have been. David Threlfall-Sykes said that the club will release further information once the current phase of redevelopment is complete, which is expected to be a matter of weeks. Att minutes are below mate www.htsa-web.com/post/meeting-minutes-of-the-all-together-town-att-panel-23-09-20Well, that makes depressing reading... What's the make-up/membership of HTSA these days? Does it warrant the 3 seats? I paid my subs for years whilst it seemed like an important fan voice, but recently it just seems like a weird rainbow alliance of loosely football-related woke causes, without seeming to do much about actual paying Town fans.
|
|
|
Post by Frankiesleftpeg on Sept 24, 2020 17:06:49 GMT 1
Club representatives stated that the current phase of redevelopment is almost complete. In response to questions from panel members, they confirmed that the three-storey building outlined in the original plans has not been built. Mark Devlin explained that the club has planning permission for the building, which may be acted upon in the future. He also stated that the club has invested approximately £6-7 million on the redevelopment project. Some panel members were disappointed that the original plans had been scaled back, while others questioned the club’s lack of communication on the subject. In general, opinions were mixed. Mark Devlin responded by assuring those present that the training facilities are excellent. He did, however, recognise that the club’s communications have not been as clear as they could have been. David Threlfall-Sykes said that the club will release further information once the current phase of redevelopment is complete, which is expected to be a matter of weeks. Att minutes are below mate www.htsa-web.com/post/meeting-minutes-of-the-all-together-town-att-panel-23-09-20Did Andy Ward have owt to say? The silence from him has been deafening since he arrived.
|
|
ben1987
Mental Health Support Group
Posts: 7,156
|
Post by ben1987 on Sept 24, 2020 17:08:04 GMT 1
Club representatives stated that the current phase of redevelopment is almost complete. In response to questions from panel members, they confirmed that the three-storey building outlined in the original plans has not been built. Mark Devlin explained that the club has planning permission for the building, which may be acted upon in the future. He also stated that the club has invested approximately £6-7 million on the redevelopment project. Some panel members were disappointed that the original plans had been scaled back, while others questioned the club’s lack of communication on the subject. In general, opinions were mixed. Mark Devlin responded by assuring those present that the training facilities are excellent. He did, however, recognise that the club’s communications have not been as clear as they could have been. David Threlfall-Sykes said that the club will release further information once the current phase of redevelopment is complete, which is expected to be a matter of weeks. Att minutes are below mate www.htsa-web.com/post/meeting-minutes-of-the-all-together-town-att-panel-23-09-20I've liked your post, but my actual feelings on the subject couldn't be any further from like. Rug absolutely pulled or what. Where's the extra £13m? Squirreled away in Upper Hopton I imagine. Last bit, my thoughts exactly. Nailed it.
|
|
ben1987
Mental Health Support Group
Posts: 7,156
|
Post by ben1987 on Sept 24, 2020 17:08:57 GMT 1
Club representatives stated that the current phase of redevelopment is almost complete. In response to questions from panel members, they confirmed that the three-storey building outlined in the original plans has not been built. Mark Devlin explained that the club has planning permission for the building, which may be acted upon in the future. He also stated that the club has invested approximately £6-7 million on the redevelopment project. Some panel members were disappointed that the original plans had been scaled back, while others questioned the club’s lack of communication on the subject. In general, opinions were mixed. Mark Devlin responded by assuring those present that the training facilities are excellent. He did, however, recognise that the club’s communications have not been as clear as they could have been. David Threlfall-Sykes said that the club will release further information once the current phase of redevelopment is complete, which is expected to be a matter of weeks. Att minutes are below mate www.htsa-web.com/post/meeting-minutes-of-the-all-together-town-att-panel-23-09-20Well, that makes depressing reading... What's the make-up/membership of HTSA these days? Does it warrant the 3 seats? I paid my subs for years whilst it seemed like an important fan voice, but recently it just seems like a weird rainbow alliance of loosely football-related woke causes, without seeming to do much about actual paying Town fans. You’d have to speak with HTSA about that one pal.
|
|
ben1987
Mental Health Support Group
Posts: 7,156
|
Post by ben1987 on Sept 24, 2020 17:18:54 GMT 1
Club representatives stated that the current phase of redevelopment is almost complete. In response to questions from panel members, they confirmed that the three-storey building outlined in the original plans has not been built. Mark Devlin explained that the club has planning permission for the building, which may be acted upon in the future. He also stated that the club has invested approximately £6-7 million on the redevelopment project. Some panel members were disappointed that the original plans had been scaled back, while others questioned the club’s lack of communication on the subject. In general, opinions were mixed. Mark Devlin responded by assuring those present that the training facilities are excellent. He did, however, recognise that the club’s communications have not been as clear as they could have been. David Threlfall-Sykes said that the club will release further information once the current phase of redevelopment is complete, which is expected to be a matter of weeks. Att minutes are below mate www.htsa-web.com/post/meeting-minutes-of-the-all-together-town-att-panel-23-09-20Did Andy Ward have owt to say? The silence from him has been deafening since he arrived. He introduced himself but that was about it. He’s not been here long so I think it’s very unfair to be questioning him at this moment in time.
|
|
|
Post by Frankiesleftpeg on Sept 24, 2020 17:23:25 GMT 1
Did Andy Ward have owt to say? The silence from him has been deafening since he arrived. He introduced himself but that was about it. He’s not been here long so I think it’s very unfair to be questioning him at this moment in time. The kick up the arse on communication seems to have worked. The club have just posted Phil's pre-match notes for the Norwich game on the website from a fortnight ago www.htafc.com/news/2020/september/phil-hodgkinsons-pre-norwich-city-notes/Better late than never I suppose.
|
|
|
Post by Galpharmer on Sept 24, 2020 17:46:58 GMT 1
Club representatives stated that the current phase of redevelopment is almost complete. In response to questions from panel members, they confirmed that the three-storey building outlined in the original plans has not been built. Mark Devlin explained that the club has planning permission for the building, which may be acted upon in the future. He also stated that the club has invested approximately £6-7 million on the redevelopment project. Some panel members were disappointed that the original plans had been scaled back, while others questioned the club’s lack of communication on the subject. In general, opinions were mixed. Mark Devlin responded by assuring those present that the training facilities are excellent. He did, however, recognise that the club’s communications have not been as clear as they could have been. David Threlfall-Sykes said that the club will release further information once the current phase of redevelopment is complete, which is expected to be a matter of weeks. Att minutes are below mate www.htsa-web.com/post/meeting-minutes-of-the-all-together-town-att-panel-23-09-20Well, that makes depressing reading... What's the make-up/membership of HTSA these days? Does it warrant the 3 seats? I paid my subs for years whilst it seemed like an important fan voice, but recently it just seems like a weird rainbow alliance of loosely football-related woke causes, without seeming to do much about actual paying Town fans. I said similar when it was set up. You'd think they'd already have a voice with the Club, why clog up this thing too. Like you say nowadays they seem to be interested in Somalian refugees and political shite. I'm sure the refugees are suffering, poor bastards, so are we.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Sept 24, 2020 17:59:22 GMT 1
Once again, the club promised the moon on a stick and unveiled ambitious plans with a huge fanfare.
The reality is a half-arsed result done on the cheap and ushered out in the hope nobody would notice or ask awkward questions.
At what point do all the smoke and mirrors become downright ambiguity and blatant lies?
The club is a shambles from top to bottom, seemingly run by charlatans and spineless yes men.
|
|
|
Post by Terrier Ramone on Sept 24, 2020 19:44:57 GMT 1
I feel incredibly let down by this, mind you I will be greatly encouraged when the 13m that was earmarked for a first class facility has been re-routed into the player recruitment fund to counteract the need to sell Grant before we buy.
The problem the board have created for themselves now is that when they say trust us, believe etc. why should we? The track record is obviously proved to be untrustworthy.
|
|
|
Post by ShortbreadPete on Sept 24, 2020 20:01:21 GMT 1
So many supporters disappointed about Canalside you have to feel for them. Good job the players and coaching staff think its a first class facility
|
|
|
Post by Up the Duff. on Sept 24, 2020 20:18:56 GMT 1
Club representatives stated that the current phase of redevelopment is almost complete. In response to questions from panel members, they confirmed that the three-storey building outlined in the original plans has not been built. Mark Devlin explained that the club has planning permission for the building, which may be acted upon in the future. He also stated that the club has invested approximately £6-7 million on the redevelopment project. Some panel members were disappointed that the original plans had been scaled back, while others questioned the club’s lack of communication on the subject. In general, opinions were mixed. Mark Devlin responded by assuring those present that the training facilities are excellent. He did, however, recognise that the club’s communications have not been as clear as they could have been. David Threlfall-Sykes said that the club will release further information once the current phase of redevelopment is complete, which is expected to be a matter of weeks. Att minutes are below mate www.htsa-web.com/post/meeting-minutes-of-the-all-together-town-att-panel-23-09-20Thanks for that Ben. Devlin said ‘communication could have been better‘.. there hasn’t been any. This was supposed to be the legacy of the premier league and our future... wow just wow
|
|
|
Post by Up the Duff. on Sept 24, 2020 20:23:39 GMT 1
Once again, the club promised the moon on a stick and unveiled ambitious plans with a huge fanfare. The reality is a half-arsed result done on the cheap and ushered out in the hope nobody would notice or ask awkward questions. At what point do all the smoke and mirrors become downright ambiguity and blatant lies? The club is a shambles from top to bottom, seemingly run by charlatans and spineless yes men. Like changing the web site stating Mooy had a years option in his contract. They can no longert be trusted in what they say and that is very concerning.
|
|
|
Post by Up the Duff. on Sept 24, 2020 20:29:53 GMT 1
So many supporters disappointed about Canalside you have to feel for them. Good job the players and coaching staff think its a first class facility Yes compared to what it was but not compared to what it should have been. This was about attracting future players. Deceit by not announcing it until asked... very poor. This money was all budgeted for to create a legacy.
|
|
|
Post by ShortbreadPete on Sept 24, 2020 20:41:25 GMT 1
So many supporters disappointed about Canalside you have to feel for them. Good job the players and coaching staff think its a first class facility Yes compared to what is was but not compared to what is should have been. This was about attracting future players. Deceit by not announcing it until asked... very poor. This money was all budgeted for to create a legacy. Do you really think future players are attracted by facilities over wages and terms/length of contract?
|
|
ben1987
Mental Health Support Group
Posts: 7,156
|
Post by ben1987 on Sept 24, 2020 20:46:18 GMT 1
Club representatives stated that the current phase of redevelopment is almost complete. In response to questions from panel members, they confirmed that the three-storey building outlined in the original plans has not been built. Mark Devlin explained that the club has planning permission for the building, which may be acted upon in the future. He also stated that the club has invested approximately £6-7 million on the redevelopment project. Some panel members were disappointed that the original plans had been scaled back, while others questioned the club’s lack of communication on the subject. In general, opinions were mixed. Mark Devlin responded by assuring those present that the training facilities are excellent. He did, however, recognise that the club’s communications have not been as clear as they could have been. David Threlfall-Sykes said that the club will release further information once the current phase of redevelopment is complete, which is expected to be a matter of weeks. Att minutes are below mate www.htsa-web.com/post/meeting-minutes-of-the-all-together-town-att-panel-23-09-20Thanks for that Ben. Devlin said ‘communication could have been better‘.. there hasn’t been any. This was supposed to be the legacy of the premier league and our future... wow just wow The canalside situation pisses me off more than current results. Something absolutely stinks and for a while I’ve something goes to sit right. Masterctacker has nailed it, I’m absolutely convinced.
|
|
|
Post by royrace on Sept 24, 2020 20:49:26 GMT 1
Club representatives stated that the current phase of redevelopment is almost complete. In response to questions from panel members, they confirmed that the three-storey building outlined in the original plans has not been built. Mark Devlin explained that the club has planning permission for the building, which may be acted upon in the future. He also stated that the club has invested approximately £6-7 million on the redevelopment project. Some panel members were disappointed that the original plans had been scaled back, while others questioned the club’s lack of communication on the subject. In general, opinions were mixed. Mark Devlin responded by assuring those present that the training facilities are excellent. He did, however, recognise that the club’s communications have not been as clear as they could have been. David Threlfall-Sykes said that the club will release further information once the current phase of redevelopment is complete, which is expected to be a matter of weeks. Att minutes are below mate www.htsa-web.com/post/meeting-minutes-of-the-all-together-town-att-panel-23-09-20Scaled back?! Lol, that's one way of putting it. Who was on the ttc podcast recently assuring fans it was still going ahead but the offices were no longer being built and that was only because some room had become available at the stadium?? Was that a bare faced lie or has the club changed its mind and decided to spend the £13M on players instead? There's some nasty whiff coming from the club recently. Honesty, integrity, respect. Lol. Sent from my SM-A515F using proboards
|
|
|
Post by Up the Duff. on Sept 24, 2020 21:04:42 GMT 1
Yes compared to what is was but not compared to what is should have been. This was about attracting future players. Deceit by not announcing it until asked... very poor. This money was all budgeted for to create a legacy. Do you really think future players are attracted by facilities over wages and terms/length of contract? Sorry but I thought the big plan going forward was to entice talented kids and develop them. The £20m facilities were the big positive to help us get some of the best weren’t they ?
|
|